Skip to main content

E RESERVOIR REPLACEMENT AND PUMP STATION PROJECT

Vista Irrigation District ("District") will be accepting proposals from qualified contractors for – E RESERVOIR REPLACEMENT AND PUMP STATION PROJECT at District Headquarters located at 1391 Engineer Street, Vista, CA 92081.

SEALED PROPOSALS DUE:   

Tuesday, November 9, 2021, by 2:00pm  

Pre-bid Conference and Job Walk-Through.  Thursday, October 21, 2021 at 10:00 a.m., has been designated as a time for Contractors and their subcontractors to have a mandatory pre-bid conference and job walk-through at the E Reservoir site located at 2330 Edgehill Road, Vista, California 92084. Prospective bidders are invited to present any relevant questions at the pre-bid conference, but insofar as practicable, questions should be prepared in written form and mailed, emailed, or faxed to the District so as to arrive no later than three (3) calendar days prior to the pre-bid conference.

All questions relative to this construction project prior to the opening of bids should be directed in writing to the District at the above address, to the attention of Greg Keppler, P.E., Engineering Project Manager, or emailed to gkeppler@vidwater.org. Questions shall be received no later than Tuesday, October 26, 2021 at 5:00 p.m. in order to be considered.

Please review all RFP documents for further details. 

Documents available on ebid board